Previous Page Next Page
I was forced to conclude that I could not mount anything permanently to the machines if it would be required to be removed or unwired for transportation. So a couple of months few by as I thought about a new path. Then while I was digging through my project parts box I realized that I had a 10" LCD screen and controller that was going to be used in another project that got canceled and I had just upgraded my media server from a Raspberry Pi 3B+ to a 4gig Pi 4B so I had an extra Pi 3B+ micro computer now too. That is when the ideas started coming fast. I was going to make an R2 Unit to hang on the front of the capsule tanks to play not just audio but video also and it could be locked in place with the chrome caps on the top of the machines. This could be removed and installed easily after the machines were set up.
Volume Control
Left
Speaker
Motion
Detector
Right
Speaker
Display
The Rise of R2G2